The narrows below Dudbridge waiting to be widened.

The Big Crane at Dudbridge Locks, from west of Dudbridge Road

Piling going in between the locks

More piling in the channel above Upper Lock. The bottom corner of the festival site is behind the crane.

This entry was posted in Latest News. Bookmark the permalink.

Comments are closed.